Heating installations with wall and ceiling heating, sanitary installations with sound-insulated / sound-optimized sewage system.
Scope:
- 57 m soundproof sewage system PE-HD pipe DN 56 to DN 100;
- 38 m sound-optimized sewage system PP pipe DN 40 to DN 100.
Waste water double pump system
- 300 m stainless steel system pipe for drinking water installation systems DN 12 to DN 25;
- 43 m pipe insulation + PVC jacket DN 12 to DN 25;
- 15 pieces of fire-resistant pipe insulation DN 12 to DN 25.
Sanitary equipment:
- 3 wash basin units;
- 2 pouring spouts;
- 2 toilet facilities.
- assembly elements for dry construction;
- heat pump system with accessories;
- 530 m pipe made of steel pipe DN 15 to DN 50;
- 530 m pipe insulation + PVC jacket DN 15 to DN 50;
- 60 m PE 100-RC pressure pipeline d 40 to 63 mm + insulation.
Wall and ceiling heating:
- 330 pieces of wall heating - registers and accessories;
- 112 pieces of ceiling heating - registers and accessories;
- 1 120 m PP pipe;
- 7 heating circuit distributors.