The objective of the contract is to provide the contracting authorities with the necessary interim staff within a pre-defined timeframe and in line with the requested profiles. The contractor shall ensure that the interim staff is available during the whole leasing period without interruptions with the exception of absences that are typical for regular work life (e.g. annual holiday or other absences not longer than one week).
Multiple framework contract in cascade with maximum three contractors.