- Unit 1: Room closing system
Subreport ELVIS ID E51888688
- Unit 2: Metalworking
Subreport ELVIS ID E62254875
- Unit 3: screed works
Subreport ELVIS ID E33965177.
Tract 1: Space Closing System
Execution in 3 separate construction phases (anticipatory measures, 1st rehabilitation section,
2nd refurbishment section)
- approx. 8,200 square meters of GK stud walls F0 to F90,
- approx. 250 sqm GK-firewalls F90-A,
- approx. 7,100 square meters of GK facing shells, partly as installation walls,
- approx. 200 sqm GK shaft walls F90,
- approx. 400 steel surround frames, partly as double rebate frames,
- approx. 40 St. window with double glazing F0 to F90, partly with interior window blinds,
- approx. 35 pcs. T30 / RS door elements, 1 leaf, door leaves with HPL surface and solid wood edge banding, incl. Hinges, locks, etc. Forged,
- approx. 5 St. sliding door elements with wooden door leaves,
- approx. 10 pieces of E30 fire curtains incl. Control,
- approx. 10 pieces of smoke protection curtains RS incl. Control,
- approx. 400 pc. Interior door leaves with HPL surface and solid wood edge banding, partly as soundproof doors, incl. Tapes, locks and fittings,
- approx. 3,000 m² GK-Abhangdecken F0 or F30, z. T. with perforated plasterboards,
- approx. 800 sqm GK-friezes F0 or F30 in different widths,
- approx. 300 St. steel inspection doors or with GK insert, F0 and F30,
- approx. 1 000 m² of suspended mineral fiber ceilings,
- approx. 1 000 sqm of metal coffered ceilings F0,
- approx. 1,200 square meters of metal fire protection ceiling F30 as corridor ceilings,
- Approx. 150 pcs LED recessed luminaires for metal fire protection ceilings F30.
Tract 2: Metalworking
Execution in 3 separate construction phases (anticipatory measures, 1st rehabilitation section,
2nd refurbishment section)
- approx. 40 pieces of sheet steel doors T30 / RS included,
- approx. 10 pieces of sheet steel doors T30 / RS double-leaf,
- approx. 15 pieces of sheet steel doors T90 / RS included,
- approx. 15 pieces of sheet steel doors T90 / RS double-leaf,
- approx. 20 pieces of aluminum-glass tubular frame doors, single or double-leaf. T30 / RS,
- approx. 5 pc. Aluminum-glass tubular frame doors one or two-winged. RS,
- approx. 15 pc. Fixed glazing / window F0 or F30 in aluminum construction,
- approx. 5 pieces T30 fire-resistant sliding windows in wood-glass construction with locking system,
- approx. 5 pc. Fixed glazing / window F30 in wood-glass-construction,
- approx. 30 pc. Fixed glazings for single or double glides. Sheet steel or tubular frame doors.
Unit 3: screed works
Execution in 3 separate construction phases (anticipatory measures, 1st rehabilitation section,
2nd refurbishment section)
- approx. 300 sqm of hard concrete screed in technical areas including moisture sealing,
- Approx. 6,000 square meters of cement screed floating on mineral fiber insulation.