Expansion of Gorkistraße in 04347 Leipzig; TO: Road and track construction
3,255 m² construction road asphalt base course 10 cm; 8 pcs felling trees; Clearing 380 m² of shrubs; 18 pcs carry out crown care; Pick up 700 m2 of stones, garbage, rubbish; Dismantle 6,140 m of cable; 350 m Break off gas pipeline DN 50-300, steel, cast iron, plastic; Remove 800 m of cable conduit; Remove 13 LSA cable ducts; 23 pcs dismantling lighting poles including cables; 400 m of pipeline demolition DN 100-150 plastic, stoneware, concrete; 11 pcs rehabilitate old tree slices; transplant 2 pcs of large tree; Supply and plant 28 avenue trees, including completion and development maintenance; 140 m2 of mixed perennial planting, including completion and development maintenance; produce 1,502 m² of lawn seeding; Break 190 m³ of concrete and masonry; Break off 14 m of angle retaining wall; Loosen and cover 77 m³ of topsoil; Loosen and recycle 149 m³ of topsoil; Supply and cover 136 m³ of topsoil; 1,004 m³ search ditch; Loosen and recycle 1,172 m³ of soil; carry out 240 m³ of soil replacement; supply and install 168 m³ of soil replacement material; Absorb and recycle 6,180 m³ of layers without binders; Pick up 676 m² of asphalt pavement 20-30 cm in the track area and recycle or dispose of it; Pick up 1,715 m² of asphalt pavement 5 cm in the track area and recycle or dispose of it; Milling and recycling or disposing of 20,429 m² of asphalt 2-12 cm; 1,400 m² concrete fastening 15 cm break up and recycle or dispose of; 697 m² concrete fastening 25 cm break up and recycle or dispose of; 1,018 m² of concrete fastening 25 cm milling and spreading; Pick up 1,400 m² of concrete fastening 25 cm in the track area and recycle or dispose of it; 27 pcs large composite panel dismantling and recycling; 498 St remove and recycle tie rod; Remove and recycle 1,494 mSch grooved rails; 871 m of concrete curbs; 1,011 m of natural stone curbs; Accommodate 121 m² of large pavement; Accommodate 1,342 m² of mosaic paving ceiling; Accommodate 994 m² of concrete pavement; Absorb 2,125 m² of copper slag pavement; 715 m² of concrete slab pavement; 830 m of paving strips; produce 3,216 m³ of frost protection/ballast base course; Produce 2,449 m² of asphalt base course 26 cm thick; Produce 3,292 m² of asphalt base course 30 cm thick; Produce 3,278 m² asphalt base course 12.1 cm thick track area; Produce 1,136 m² of asphalt binder layer 6 cm thick; Produce 5,545 m² of asphalt binder layer 8 cm thick; Produce 3,179 m² asphalt binder layer 5 - 6 cm thick track area; Produce 7,110 m² of grit mastic asphalt 4 cm thick; 2,836 m² asphalt surface course made of MA 8 S 3.5 cm track area; Produce 200 m² concrete base course 20 cm thick track area; Produce 2,586 m² of concrete base course 25 cm thick track area; 2,530 t Produce hydraulically bonded base course 20 cm thick; Install 504 m³ of lean concrete layer to improve the substrate; 1,340 m of natural curb; 575 m Natural curb set, Mat. of the AG; 512 m set concrete curb; 152 m stop board (studded board for bus/tram combination); 1,750 m of pavement from large concrete pavement 1 row; 230 m Pavement row from copper slag pavement 1 row, Mat. of the AG; Produce 3,017 m² of concrete pavement; 177 m² concrete paving pavement Mat. of the AG; Laying 375 m² of guide plates for the blind; Produce 1,057 m² of mosaic paving Mat. of the AG; Make 580 m² of mosaic paving ceiling; produce 334 m² of natural stone small or large paving surface; 173 m² of copper slag paving pavement, Mat. of the AG; 40 m of steel mesh fence; Dismantle 252 m of railings; 49 St Expand road drains, including connecting lines; 62 St Establish road drains, including connecting cables; Construct 516 m drainage ditch with DN 150 partial seepage pipe and control shafts; Install 24 pcs rail drainage box; Install 6 pcs track drainage box; marking and signage work; 1,943 m³ of pipeline trenches/pits and partly cable protection for utilities; 114 m³ of trenches for electrical supply, station equipment including cable protection; 17 pcs cable pull shafts; 34 pcs production of lighting points, including electrical installation work; 1,350 m of cable laying street lighting including cable trench and cable protection; 41 pcs compact cable ducts ; 1 pcs street lighting cabinet; 13 pcs Manufacture and dismantle temporary light points, including power air cables; 3,365 m of cable conduit LSA including cable trench ; Laying 151 m PP pipe OD 315; 4 pcs make precast shafts from reinforced concrete; make 30 m steel mesh fence including gates; 143 m of steel railings; 1 pc make service water well; 4 pcs Produce signposting, including implementation documents and statics; 41 pcs install bicycle leaning brackets; 1 St "Manufacture of stairs including assembly, work and detailed plans as well as supplementary ; static verifications"; 149 pcs grooved rails unloaded, straightened; 164 pcs weld joints; 1,020 mGl voltage equalization; 20 pcs voltage balancing welding; 986 mGl grinding of the new rails; Milling and potting 4,447 m of longitudinal joint on grooved rail; 914 mGl of track construction system components supply - area mainline track, R>=40m; Supply 106 mGl of track construction system components - area mainline track, R<=40m; 960 mGl track construction system to build slab track, sleeper spacing 750mm, R>=40; 100 mGl track construction system to build slab track, sleeper spacing 750mm, R<=40; 44 mGl track construction system Build slab track (smaller sleeper distance); 22 mGl track construction system Build slab track (greater sleeper distance); supply 172 mGl of track construction system components; Backfill 105 mGl transverse sleeper track, tamp by hand; Install 105 mGl chamber filling elements; Build and tamp 91 mGl grooved rail track on tamping dam; fill 91 mGl of rail chambers with chamber stones; 4 pcs seat element, 3-seater with backrest, set up; 1 Psch dismantling catenary, masts including foundations, wall fastenings, transverse bracing and chains; 15 pcs of steel pipe foundation pipes for pylon sites; 11 pcs erect prestressed concrete pylon; 25 pcs fastening with wall rosette ; 12 pcs fastening with articulated bracket; 1,550 m of catenary, suspension cable and chainwork; 19 pcs Assemble transverse structure; Assemble 4,100 m of bronze rope; Install 260 pcs of current-proof trailers; 4 pcs roadway separator with copper skids in chainwork catenary; 7 pcs mount mast disconnector; Set up 4 pcs combination masts