Motorway construction works | Tenderlake

Motorway construction works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 June 2021
Closing Date:
22 July 2021
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
L30035, GV Trassee Raron East — Visp West

Trassee A9 motorway section km 138 720 - 140 701.18, as well as access and departure ramps including the necessary plant lines, road drainage, KSR pipes. In addition, a weight wall, south of the road and a game passage must be created. The construction process must take place in stages. Construction lots can only be done from the west (asphalted construction track), via the St. German underpass, about km 138 600. Significant truck traffic will be present on the construction track. Game passage must be created at least 6 months before the pavement is built. Other contractors operate from Oct. 2021 to end of April 2022 at km 138 900 - 139 360.

— excavation/removal 75 000 m 3,

— bulking up/installation bulk material 31 500 m 3,

— in-situ concrete wing wall 1 180 m 3,

— cyclop wall 490 m 3,

— in-situ concrete road signs 24 pcs,

— gravel sand UG 0/45 (foundation layers) 40 000 m 3,

— pipelines KSR 14 000 m,

— inlet and control shafts 75 pcs,

— surface 60 380 m 2,

— slotted troughs 2 050 m,

— plant lines 1,500 m,

— Game passage 1pcs..

Trassee A9 motorway section km 138 720 -140 701.18, as well as access and departure ramps including the necessary plant lines, road drainage, KSR pipes. In addition, a weight wall, south of the road and a game passage must be created. The construction process must take place in stages. Construction lots can only be done from the west (asphalted construction track), via the St. German underpass, about km 138 600. Significant truck traffic will be present on the construction track. Game passage must be created at least 6 months before the pavement is built. Other contractors operate from Oct. 2021 to end of April 2022 at km 138 900 - 139 360.

— excavation/removal 75 000 m 3,

— bulking up/installation bulk material 31 500 m 3,

— in-situ concrete wing wall 1 180 m 3,

— cyclop wall 490 m 3,

— in-situ concrete road signs 24 pcs,

— gravel sand UG 0/45 (foundation layers) 40 000 m 3,

— pipelines KSR 14 000 m,

— inlet and control shafts 75 pcs,

— surface 60 380 m 2,

— slotted troughs 2 050 m,

— plant lines 1,500 m,

— Game passage 1pcs..

Download full details as .pdf
The Buyer:
Dienststelle für Nationalstraßenbau (DNSB)
CPV Code(s):
45233110 - Motorway construction works