New construction of a primary school and daycare center at Lincoln Settlement_Fixed-in sports equipment.
The science city of Darmstadt intends to build a new elementary school and day care center with a two-field sports hall in the Lincoln settlement in Darmstadt.
The building will be built in solid construction with load-bearing outer walls and columns as well as economical ceiling spans and stiffening cores. The partitions to the learning landscapes are designed as transparent system partitions in a mullion-transom construction.
Gross floor area: approx. 11 200 m
Levels: 3 including basement
Overall dimensions LxWxH: approx. 96 x 65 x 8 m (over the terrain)
The subject of the advertised services is the provision of the performance of the permanently installed sports equipment for the aforementioned project. In addition, reference is made to the specification of services.