The lot 05.1-030 Steel Construction/Locksmith of the project “NaturThermeTemplin Attractiveness” mainly comprises steelwork in the area of the newly built children's playhouse:
Children's playhouse:
Steel construction:
- Assemble, maintain and disassemble 317 square meters of safety nets
- 13.5 t roof rack HEM 450 S235
- 1.75 t coupling rods HEA 140 S235
- 30 m tension rod system Rd 16mm, as diagonals
- 42 m tension rod system Rd 20mm, as diagonals
- 20 m pull rod system Rd 124mm, as diagonals
- 300 kg small iron parts
- 317 sqm trapezoidal sheet covering 150.1
- 2 pcs Transverse change skylights
- 2 pcs trapezoidal sheet cutouts + edging profiles for skylights
locksmith:
- 1 pcs Steel stairs, single, 3 steps outside including powder-coated flat steel railings and stainless steel handrail
- 1 pcs Steel stairs technical cellar provisional, 3 steps
- 11m railing, hot-dip galvanized steel H 1.00m in the technical cellar
- 4m stainless steel wall handrail on reinforced concrete wall including brackets
- manhole covers pump sump grating
- Shaft cover light shaft grating
Quiet deck:
- 16m stainless handrails on reinforced concrete balustrade including spacers
The NaturthermeTemplin (NTT) is a thermal bath opened in 2000 in
Templin. It is a spa and recreation facility of supraregional importance and is particularly focused on families. NTT was built from 1998 to 2000 and was extensively renovated and partially rebuilt in 2006.
The aim for the planned measures to attractiveness NTT is to further adapt the building, attractions and offers of NaturthermeTemplin GmbH to the needs of the guests and to further increase the quality of stay. In addition, attractions and framework conditions for the warm season are to be created in order to achieve consistent utilization stability. For this purpose, a new sauna cabin, a children's playhouse with an integrated water splash area and dwarf gods, and a guardwork will be built outdoors, among other things.