Engineering services | Tenderlake

Engineering services

Contract Value:
EUR 222K - 222K
Notice Type:
Contract Notice
Published Date:
25 February 2020
Closing Date:
26 March 2020
Location(s):
DE235 Cham (DE Germany/DEUTSCHLAND)
Description:
New fire station Cham - technical equipment, plant groups 1, 2, 3, 7 and 8, service phases 2-9 according to §§ 53 ff. HOAI

The city of Cham is planning to build a new fire station for the volunteer fire department at Further Straße 6 in Cham.

After demolition of the existing fire department equipment house, a new building with approx. 2,977 m is to be built 2 Usable space can be realized.

According to the spatial program, the new building should provide space for the following areas:

- Vehicle hall (1,454 m 2 )

- Rooms for handling operations and exercises (233 m 2 )

- Rooms for training, residence and administration (346 m 2 )

- Workshops / storage rooms (639 m 2 )

- Other areas (technical, sanitary and traffic areas) (305 m 2 ).

There are approximately 60 parking spaces outside (alarm, guest and service parking spaces).

The total costs (KG 200-700, DIN 276) are currently estimated at around EUR 12 million gross.

A complete completion of the measure is planned for August 2023.

It is intended to commission the following services (in stages) with this tender:

Technical equipment, plant groups 1, 2, 3, 7 and 8, service phases 2 to 9 according to §§ 53 ff. HOAI.

The city of Cham is planning to build a new fire station for the volunteer fire department at Further Straße 6 in Cham.

After demolition of the existing fire department equipment house, a new building with approx. 2,977 m is to be built 2 Usable space can be realized.

According to the spatial program, the new building should provide space for the following areas:

- Vehicle hall (1,454 m 2 )

- Rooms for handling operations and exercises (233 m 2 )

- Rooms for training, residence and administration (346 m 2 )

- Workshops / storage rooms (639 m 2 )

- Other areas (technical, sanitary and traffic areas) (305 m 2 ).

There are approximately 60 parking spaces outside (alarm, guest and service parking spaces).

The total costs (KG 200-700, DIN 276) are currently estimated at around EUR 12 million gross.

A complete completion of the measure is planned for August 2023.

For the new construction of the fire station in Cham, the services of the technical equipment, system groups 1 (waste water, water and gas systems), 2 (heat supply systems), 3 (ventilation systems), 7 (use-specific systems) and 8 (building automation) are in accordance with §§ 53 ff. HOAI.

The services are ordered in stages.

Initially, in the first commissioning stage, service phases 2 and 3 (preliminary planning and draft planning) are commissioned in accordance with Section 55 HOAI. The service phases 5 to 9 are called up in stages. There is no legal claim to the entire assignment.

Download full details as .pdf
The Buyer:
Stadt Cham
CPV Code(s):
71300000 - Engineering services
71315000 - Building services