The object of this order is the assembly with the design and commissioning of photovoltaic installations with a total capacity of min. 200,00 kWp in the area of Podkowa Forest with the delivery of car chargers.
A detailed description of the subject of the order and the method of execution of the task can be found in PDF (hereinafter referred to as PFU), annex 8 to SWZ.
In the framework of the work covered by the task, the contractor is obliged to carry out the following activities related to the investment process indicated by the Contracting Authority:
(a) Conceptual projects of photovoltaic installations up to 50 kW;
(b) Projects for the construction of the photovoltaic installation (distribution of panels and calculation of the installation load);
(c) Execution for the installation of electrical schemes of photovoltaic installations and installation elements on the section from the photovoltaic installation to power output in object switchgear or cable connectors;
(d) Projects with the delivery, installation and commissioning of public two-station charging stations;
(e) Reconciliation of projects in terms of provisions with the fire appraiser;
(f) Reconciliation of charging station designs with the Technical Supervision Authority;
g) Reconciliation of projects with the Mazowiecki Conservator of Monuments;
(h) Reconciliation of projects with the Distribution System Operator /insofar as necessary to put the photovoltaic installations and chargers into service;
(i) Execution of photovoltaic installations, chargers in accordance with the requirements of the contracting Authority, together with the preparation of the connection documentation;
j) Supply and assembly of necessary components for commissioning and commissioning of photovoltaic installations, chargers.