They have to be done
755 m 2 Clean reinforced concrete, floor and ceiling panels
550 m 2 Smoothing filler to compensate
450 m 2 Prepare the floor surface with a suitable grinder
755 m 2 PE film, 2-ply
585 m mineral wool strip, for the edge insulation
175 m 2 Surfaces of the floor area with bituminous paint
175 m 2 Vapor barrier layer of bituminous welding track
530 m 2 floating cement screed
400 m 2 Impact sound insulation layer as underlay
95 m 2 Mending Floating cement screed
95 m 2 Cement screed in small area
Rebuilding and extension of the Children's Hospital St. Marienhospital Vechta gGmbH in Vechta.