Stadtwerke Rheine intend to build a new indoor pool at the existing outdoor pool on Kopernikusstrasse.
- Basement: approx. 2,060 m
- Ground floor: approx. 3 350 m
- Upper floor: approx. 895 m
- Total: approx. 6,305 m
- sheet steel doors 2 pcs.,
- Sheet steel doors F30-RS 11 pieces,
- Insulated roller shutter 2 370 x 2 400 mm,
- Project door damp room 19 pieces,
- Project door damp room T30 RS 6 pieces,
- Project door wet room 18 St.,
- Project door wet room T30 RS 1 pc.