Sewage treatment services | Tenderlake

Sewage treatment services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 August 2023
Closing Date:
14 September 2023
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DEA NORDRHEIN-WESTFALEN (DE Germany/DEUTSCHLAND)
DEA5 Arnsberg (DE Germany/DEUTSCHLAND)
DEA5A Siegen-Wittgenstein (DE Germany/DEUTSCHLAND)
Description:
Faulturm II

engineering services

Digester 2 of the Siegen sewage treatment plant was built in the 1970s as a prestressed concrete tank and is still operated in accordance with its function today.

The tank has a gross volume of approx. 3,600 m3 and a diameter of 16.5 m in the cylindrical part. The total height is approx. 21 m, with the lower truncated cone integrating approx. 7 m into the ground. Accessibility is via an approx. 580 mm manhole near the ground in the cylindrical part and via the dome openings. The container is mixed vertically with a screw shovel that sits in a flow guide tube.

The digester is to be comprehensively renovated and modernized. The planned refurbishment includes structural repairs, renewal of the process technology and energy optimisation.

Bewertungsmatrix:

Project team: 8%

Qualification project management: 18%

Project delivery: 18%

Planungsleistung: 6%

Response time: 5%

Quality of the offer document: 12%

Honorarermittlung RETURN: 15%

Special services: 8%

Special services: 10%

Download full details as .pdf
The Buyer:
Entsorgungsbetrieb der Stadt Siegen (ESI)
CPV Code(s):
45252100 - Sewage-treatment plant construction work
90420000 - Sewage treatment services