New construction of a primary and secondary school for 23 classes
Outdoor facilities for replacement new building GMS Feuchtwangen-Land as part of the school center with secondary school, high school, indoor pool, sports halls and canteen; the school center's break yards are in open connection with each other. The building plot is characterised by its hillside location.
The outdoor facilities are located between the school building, gym and indoor pool.
Main access between school and outbuilding to the central schoolyard with concrete slabs; asphalting schoolyard, uses (climbing, street basketball and tree grove) as islands with color asphalt, tartan covering or water-bound pavement set off the asphalt. The height difference of 3.30m to access the existing gymnasium is intercepted via an amphitheater.
The second access road leads from the west between the replacement building and the canteen to the school car park. The roadway is paved and the pitches are trained as grass joint paving.
A row of trees and hedge elements are planted to the public road. There are other parking spaces to the west of the road, which can be accessed via the Dr.-Hans-Güthlein Weg.