Vesterveien and Myrbakken shall be reconstructed and adapted the new traffic pattern. These roads were previously alignments for E39 and FV456, which go now through a new tunnel. The roads shall be reconstructed to 2-lane local roads (approx. 1,1 km) with 6 bus-bays. A new and wider cycle path with a pavement along the total section (approx. 1,1 km). The foot and cycle path shall be constructed in a culvert (approx. 35 metres) under Vesterveien with an entrance to Hannevika industrial area.