Reorganization and renovation of the cooperative comprehensive school Leeste, Schulstr. 40, 28844 Weyhe. The existing school building is a two-storey flat roof construction in reinforced concrete and masonry construction from 1973/74 with a gross floor area of approx. 14,000 m
Delivery and assembly of 2 machine room-less
Passenger lifts with gearless drive in the shaft head, vibration-insulated on the guide rails. The first elevator should offer 2 stops and the second elevator 3 stops.