The partial renovation of the existing library building will be carried out during ongoing operations over the next 2 years. Essentially, this involves earthquake retrofitting, roof renewal, door and glass replacement and railing adjustment.
Delivery and assembly of 26 t of structural and reinforcement steel as well as CFRP slats; approx. 900 m
Approx. 350 m
Approx. 750 m
Disassembly and replacement of glass for approx. 350 windows in a size of approx. 1-2 m
Delivery and installation of approx. 880 m
- Flumroc Topa or glw ceiling insulation; about 1 100 Heraclith;
- ceiling insulation and 780 m
- Wall insulation of different thicknesses.
BKP 230 electrical installations
New sub-distributions, adjustments to the installations where necessary. Installation of new kitchen and HVAC equipment.
BKP 243/246 heating and cooling systems
Replacement of the heating components with wear and the entire control system. Disassembly and reassembly of radiators. New laying of parts of the underfloor heating. Disassembly of the refrigeration units.
Replacement of the ventilation components with wear and the entire control system. Replacement of the fire damper actuators. Development of new rooms on the ground floor and upper floor. Complete renovation of the kitchen.
Renewal of toilet facilities and catering kitchen as well as the entire cellar distribution on 3 floors.
Scissor lift 4,000 x 2,000 mm; Lifting capacity 4 t; including all control and safety devices.
- approx. 250 m
- approx. 450 m