Flooring work.
The following work is planned as part of the construction project:
1st construction phase new building:
- Laying a rubber covering in tile form (large format) as a coherent area of approx. 754 m
- cement screed substrate,
- Surface of the rubber covering in slate look, seamless laying, 10 cm base made of the same material,
- Installation of a multi-part entrance mat system in the windscreen area, size approx. 4.50 x 3.40 m;
2nd stage of construction:
- Contiguous area approx. 659 m
An essential criterion for the floor covering is the suitability for driving on an electric pallet truck with a total load of up to approx. 2 tons!