As part of an urban reorganization in the valley city, the city of Schramberg intends to build a new school campus and daycare center. A 5-group daycare center, a 4.5-speed combined school (secondary school, 2-speed+ community school, 2-speed+ community school) with canteen and a 7-group special education and counselling center (SBBZ) are to be developed on the approximately 25,534 m² competition site.
For this purpose, the city of Schramberg held an architectural competition followed by a procurement procedure with the prize winners of the competition. The project is realized by Kamm Architekten BDA, Stuttgart.
The procurement procedures for specialist engineers for the new building of the daycare center were already carried out in 2020. The planned start of construction for the day care center is at the end of 2021. The subject of the award procedure announced here is the new construction of the Verbund School with SBBZ, including canteen and nursery.
A landscape architect is being sought for planning and construction supervision services in the area of Verbund Schools and SBBZ for work phases 1-9 based on HOAI 2021, §§ 38-40 for outdoor facilities. The assignment should take place in stages. In the first stage, the work phases 1-2 are commissioned.
For planning and construction supervision services in the interim former daycare center, as well as in the sports hall, primary school and light play house, a landscape architect is being sought for work phases 1-2, optionally 3-9, based on HOAI 2021, sections 38-40 for outdoor facilities. The assignment should take place in stages. In the first stage, the work phases 1-2 are commissioned.
The 4-storey building on the slope is divided by incisions and atriums to illuminate the deep areas of the building. A realization in timber construction from board stackable ceilings and thickwood walls, or wood-hybrid construction is planned. Energy requirements are covered by a combined heat and power plant with heat recovery and power generation.
The NUF is approximately 6,730m².
The total project costs KG 300+400 are estimated at around €25.4 million gross.
Planning starts (LP 1+2) immediately after completion of the VGV procedure, planned start of construction 01/2024, planned completion 07/2026.
The new building should serve as a role model in terms of sustainability and energy efficiency.
Structural requirements for the use of rain and gray water in the building and in particular for irrigation of the open spaces must be taken into account.
,
The Verbundschule and SBBZ outdoor areas of around 6,400m² include the schoolyard, the school forecourt, as well as retaining walls and staircases for opening up the ramp and the back of the school building. The estimated costs (KG 500) are around €1 million net.
In addition, a master plan is to be drawn up for the space to be realised at a later date, consisting of interim areas of the former kindergarten and areas from the ideas section of the architectural competition, which includes the new construction of the primary school, the sports hall and the light house. The schoolyard for the future planned primary school, forecourt and environment of the extended sports hall, including outdoor sports areas, is to be built on these areas. It is also necessary to reorganize the public space between the playhouse and the sports hall. The size of the open spaces for these areas is approximately 12,700 m². The delimitation of the areas is still preliminary and has to be defined together with the client in the planning phase. The estimated costs (KG 500) are around €1.7 million net.
,
A landscape architect is being sought for planning and construction supervision services in the area of Verbund Schools and SBBZ for work phases 1-9 based on HOAI 2021, §§ 38-40 for outdoor facilities. The assignment should take place in stages. In the first stage, the work phases 1-2 are commissioned.
For planning and construction supervision services in the interim former daycare center, as well as in the sports hall, primary school and light play house, a landscape architect is being sought for work phases 1-2, optionally 3-9, based on HOAI 2021, sections 38-40 for outdoor facilities. The assignment should take place in stages. In the first stage, the work phases 1-2 are commissioned.
,
The negotiation talks are expected to take place on 17.02.2022.