Heating, ventilation and air-conditioning installation work | Tenderlake

Heating, ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 November 2020
Closing Date:
14 December 2020
Location(s):
DEA26 Düren (DE Germany/DEUTSCHLAND)
Description:
Drying room and dehumidifying system

Drying room u. Dehumidification system - Construction and commissioning of a fully air-conditioned drying room and associated system technology with an adjustable exhaust air dew point temperature of up to -50 O C with an air volume of approx. 7,500 m³ / h

- Construction of a drying room envelope with the dimensions:

Width approx. 7.90 m, depth approx 7.30 m, height approx 3.70 m and a maximum leak rate of 0.09 l / m 2 * s at a differential pressure of dp = +/- 20 Pa to the environment.

Drying room u. Dehumidification system - Construction and commissioning of a fully air-conditioned drying room and associated system technology with an adjustable exhaust air dew point temperature of up to -50 O C with an air volume of approx. 7,500 m³ / h

- Construction of a drying room envelope with the dimensions:

Width approx. 7.90 m, depth approx 7.30 m, height approx 3.70 m and a maximum leak rate of 0.09 l / m 2 * s at a differential pressure of dp = +/- 20 Pa to the environment.

Download full details as .pdf
The Buyer:
Forschungszentrum Jülich GmbH – Team Bau
CPV Code(s):
45210000 - Building construction work
45214600 - Construction work for research buildings
45223000 - Structures construction work
45223800 - Assembly and erection of prefabricated structures
45331000 - Heating, ventilation and air-conditioning installation work