Sewer cleaning 2023-2026
The public drainage canals of the city of Riedstadt with a total length of around 100km are to be cleaned every six months. The tendered service includes the cleaning of the sewer system (SW, MW and RW channels, DN 100 to DN 2000) including the existing shafts and special structures.