The subject of the contract is: design and execution of the cold corridor installation along with the replacement of the air conditioning system in the server room 157, installation of the water treatment plant, installation of the following systems: SKD, PDU, PPO, SSWiN and connection and commissioning of the Equipment together with the necessary Software and performance of final tests.
The subject of the contract is: design and execution of the cold corridor installation along with the replacement of the air conditioning system in the server room 157, installation of the water treatment plant, installation of the following systems: SKD, PDU, PPO, SSWiN and connection and commissioning of the Equipment together with the necessary Software and performance of final tests.