Construction of a roundabout in concrete construction
1.750 m Schutzzaun
7,250 m3 of topsoil loosening
200 m3 Betonaufbruch
Loosening and installing 4,400 m3 of soil
8,000 m2 of qualified soil improvement
130 m Durchlassrohre
3.700 m3 Frostschutzschicht
1.700 m2 Asphalttragschicht
265 m Ortbetonbalken
1,450 m2 Betonfahrbahndecke
115 m troughs