153 Hospital Vilsbiburg - Extension and structural adjustment.
- approx. 300 m buried underground heating pipe with leakage monitoring and earthworks DN 125,
- about 1 pc main distribution 5 groups,
- approx. 4 St. main circuit pumps,
- approx. 9 pcs. VE pumps,
- approx. 4 St. KVS pumps,
- approx. 1 pressure maintenance,
- approx. 1 hot water fresh water station,
- approx. 180 St. heating fittings,
- approx. 77 St. hygienic radiator tubular radiator,
- approx. 9 St. bath radiators,
- approx. 28 pc. Radiant ceiling panels electrically with control,
- approx. 2,600 m heating pipes steel pipe with fittings DN 15-DN150,
- approx. 40 m composite pipe DN 15 with thermal insulation,
- connection to stock,
- Fire protection measures.