1. The subject of the contract is the supply of electricity in the period from 1.4.2020 to 30.9.2021 to 1 252 consumption points (PPE) with a total estimated volume (+/- 10%) 19 461.89 MWh, of which :
1) to premises and facilities (part 1 of the contract) - 14 323.83 MWh - a detailed list of PPE is attached as Annex 1a to the Terms of Reference,
2) for road lighting (part 2 of the contract) - 5 138.06 MWh - a detailed list of PPE is attached as Annex 1b to the Terms of Reference.
The forecast electricity consumption indicated above is indicative and may differ from the amount of energy actually consumed during the contract period.
2. CPV code under which the subject of the contract is classified:
09300000-2 - Electricity, heat, solar and nuclear energy
09310000-5 - Electricity.
3. Settlement periods - 1 month.
A detailed description of the subject of the contract is included in Annex 1a / 1b to the ToR.
1. Number of measuring systems accounting for electricity used 725 pcs.
2. A detailed description of the collection points (PPE) the Employer has included in Annex 1a to the ToR.
3. Estimated electricity consumption during the contract period (+/- 10%) 14 323.83 MWh, of which:
zone I: 10 033.16 MWh,
zone II: 3,085.62 MWh,
zone III: 1,205.05 MWh.
The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.
4. Deliveries will take place from 1.4.2020 to 30.9.2021, with the proviso that the details regarding delivery dates (start and end) in relation to individual tapping points are described in Annex 1a to the ToR, column 'period supply ".
5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'delivery period').
1. Number of measuring systems accounting for electricity consumed 528 pcs.
2. A detailed description of the collection points (PPE) the Employer has included in Annex 1b to the ToR.
3. Estimated electricity consumption over the duration of the contract (+/- 10%) 5 138.06 MWh, of which:
zone I: 1 999.07 MWh,
zone II: 3 138.99 MWh,
zone III: 0.00 MWh.
The above data is indicative. The contractor should take into account possible fluctuations in electricity consumption.
4. Deliveries will take place from 1.4.2020 to 30.9.2021, with the proviso that the details of delivery dates (start and end) in relation to individual collection points are described in Annex 1b, column "delivery period" .
5. Current electricity supply contracts will expire or terminate with effect from the day preceding the planned delivery start date (column 'delivery period').