Snow-clearing services | Tenderlake

Snow-clearing services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
02 August 2023
Closing Date:
04 September 2023
Location(s):
PL229 Gliwicki (PL Poland/POLSKA)
Description:
Winter road maintenance in the city of Gliwice in the years 2023-2024

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops.

Division NO 1

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

District No. 10, SPP zone and old town lanes

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

District No. 11 PUBLIC TRANSPORT STOPS

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division No. 12 (emergency crossing)

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NO 2

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NO 3

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NO 4

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NR 5

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NR 6

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division NO 7

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division No. 8 (sidewalks west)

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Division No. 9 (sidewalks east)

The subject of the contract is winter maintenance of roads with a total length of approx. 441 km and an area of 3 505 053.25 m2 and internal roads with a length of approx. 51 km and an area of 224 543.54 m2 in the City of Gliwice. Within the regions, the Contractors will carry out winter maintenance of 170 category 1 roads, 90 category 2 roads and 539 category 3 roads. Snow removal covers 890 road streets in the city, sidewalks and bicycle paths with a total length of approx. 249 km and an area of 837 967 m2, 394 public transport stops. The maintenance also covers the location of non-public roads – internal roads managed by the Ordering Party. Launching the Winter Action by the Ordering Party includes launching one day of winter maintenance of the entire region or a one-time trip through the entire region. The order will be carried out in a division into tasks, with each of the tasks corresponding to one snow removal area. The W-1 list contains a detailed list of all districts. One Contractor or entities acting jointly may submit bids for a maximum of four tasks of their choice. The Contracting Authority determines the conduct of the Winter Action in the period from 15 October to 14 April. The remuneration for readiness will be paid after the end of each month, in the period from 15 October to 14 April or from the date of signing the contract to the date of its termination for each day of maintaining readiness. All guaranteed services not used by the Ordering Party will be paid after the end of the contract.

The Ordering Party specifies the Guaranteed Benefits that they contain includes:

• The cost of constant readiness – paid monthly during the term of the contract.

• Winter Action Days – 5 days

• Single rides – 5 rides

• Emergency crossing – 900 journeys

Under this contract, the Ordering Party provides for the possibility of exercising the option right, to the extent not greater than shown below:

• Days of Action Winter – 28 days

• Days of Winter Action in regions A – 17 days

• Single rides – 35 rides

• Post-winter sweeping – 2 times

• Snow removal – 5 times

• Emergency trip – 2800 journeys

Details of the order are included in the Description of the Subject of the Order - Appendix NO. 7 to SWZ.

Download full details as .pdf
The Buyer:
Zarząd Dróg Miejskich w Gliwicach
CPV Code(s):
90610000 - Street-cleaning and sweeping services
90620000 - Snow-clearing services
90630000 - Ice-clearing services