This tender relates to Nuon’s intention to develop, design, engineer, construct, commission and deliver a 150 MWth Heat production facility (4x30 MWth Heat Only Boiler & 30 MWth (3 600 m
Project scope:
— Total heat production capacity of approx.150 MWth.
— Expect to install fire-tube boilers, rated approx. 30 MWth on natural gas.
Main Equipment involves at least:
1. Fire-tube boilers with Low-NOx burners;
2. Heat Buffer, 3600 m
3. Civil Works (building construction, roads/pavement) and site preparation / restore construction & site premises;
4. Piping;
5. Electrical and Instrumentation.
An 150 MWth Heat Production Facility (4x30 MWth Heat Only Boiler & 30 MWth, 3600m3 Heat Buffer) hereafter referred to as HPF, in the Amsterdam South region.
Project scope:
— Total heat production capacity of approx.150 MWth.
— Expect to install fire-tube boilers, rated approx. 30 MWth on natural gas.
Main Equipment involves at least:
1. Fire-tube boilers with Low-NOx burners;
2. Heat Buffer, 3 600 m
3. Civil Works (building construction, roads/pavement) and site preparation / restore construction & site premises;
4. Piping;
5. Electrical and Instrumentation;
Project location:
Greenfield project – Urban area Amsterdam.
The contract should cover:
— Engineering / design,
— Procurement,
— Construction,
— Operational Testing,
— Commissioning including testing.
The anticipated contract duration is based on:
— 1.5 year realisation,
— Defects notification period.