Contract for the operation of demolition of built and unbuilt works, then the construction of 56 collective dwellings and eight single dwellings in free access, PALS and mastered accession — streets of the Meunier and General Leclerc in Lys-lez-Lannoy (59390).
The mission elements which will be entrusted to the holder are:
- Sketch (ESQ);
- diagnosis (DIAG);
- feasibility study;
- Summary preliminary design (APS);
- Final preliminary design (PDA);
- Project (Pro);
- Assistance with works contracts (ACT);
- Visa;
- Direction of the execution of works (DET);
- Assistance to reception operations (AOR);
— Scheduling, Pilotage, Coordination (OPC) as a variant required.
The mission elements which will be entrusted to the holder are:
- Sketch (ESQ);
- Diagnosis (DIAG);
- feasibility study;
- Summary preliminary design (APS);
- Final preliminary draft (APD);
- Project (PRO);
- Assistance with works contracts (ACT);
- visa;
- Department of works execution (DET);
- Assistance with reception operations (AOR);
— Scheduling, Pilotage, Coordination (OPC) as a variant required.