Varden school was built in 1964-1967. The school shall now get a complete upgrade. Four buildings shall be demolished (2 691 m2). The main building's wing A shall be renovated (2 275 m2) and a new wing B (3 902 m2) shall be constructed. A new access road and new car parks shall be constructed. A new system for handling surface water in the entire area shall be installed and all the developed play areas shall be renewed.