Public transport services in the area of the district Vulkaneifel on the lines 530 - 539 and the lines 540 - 549
Partial line bundle "Kylltal Ost"The services to be awarded include the following lines:
530: Oberbettingen Bf – Hillesheim – Walsdorf – Rockeskyll – Pelm – Gerolstein – Hillesheim –
Oberbettingen Bf
531: Hillesheim – Bolsdorf – Lammersdorf – Dohm – Niederbettingen – Bewingen – Gerolstein – Pelm – Kasselburg
532: Gerolstein Bf – Lissingen – Hinterhausen – Kopp – Birresborn – Michelbach – Büscheich – Gerolstein Bf
534: Gerolstein Bf – Pelm – Berlingen – Kirchweiler – Hinterweiler – Neroth (– Neunkirchen – Pützborn – Daun)
535: Gerolstein Bf – Gees – Pelm – Berlingen – Hohenfels-Essingen – Rockeskyll
536: Dockweiler – Oberehe-Stroheich – Zilsdorf – Walsdorf – Hillesheim – Oberbettingen Bf – Niederbettingen
537: Dockweiler – Dreis – Brück – Heyroth – Nohn – Ahütte – Üxheim – Niederehe – Loogh – Kerpen – Niederehe – Heyroth – Brück – Dreis – Dockweiler
538: Oberbettingen – Hillesheim – Berndorf – Flesten – Leudersdorf – Üxheim – Ahütte – Niederehe – Loogh – Kerpen – Berndorf – Hillesheim – Oberbettingen
539: Hillesheim – Berndorf – Wiesbaum – Mirbach
The sub-line bundle ensures the connection of the northwestern district area to the stations of the Eifel line in Gerolstein and Oberbettingen-Hillesheim. Furthermore, connections are established between the local communities and the assigned basic centre (Hillesheim) or middle centre (Gerolstein and Daun [with transfer connections]). Essential for the line bundle is to ensure the accessibility of all school locations in the catchment area, such as the secondary schools (including vocational schools) in Daun, Gerolstein and Hillesheim as well as primary schools in Birresborn, Gerolstein, Hillesheim and Üxheim. The day-care centres in Birresborn, Gerolstein, Pelm and Üxheim will also be connected.
The services in bus transport can be provided on schedule with 18 vehicles (2 solo buses Bn, 14 solo buses B, 1 articulated bus GBn, 1 minibus NB) and in an average calendar year with rounded 487,953 commercial car kilometers p.a. and rounded 13,500 timetable hours p.a. A total of 7 vehicles (of which min. 4 vans) are required for the services in on-call traffic. In the event that a subcontractor is commissioned, it must be ensured that a total of 7 vehicles can be used for call traffic. The estimated occupied kilometers (rounded) are 128,595 Bkm p.a.
Partial line bundle "Kylltal West"The services to be awarded include the following lines:
540: Jünkerath Bf – Stadtkyll – Kronenburg (NRW) – Hallschlag – Ormont – Neuenstein – Neuendorf – Olzheim – Walcherath – Prüm
541: Jünkerath Bf – Schüller – Stadtkyll – Kronenburg (NRW) – Hallschlag – Scheid – Ormont – Kerschenbach – Stadtkyll – Schüller – Jünkerath Bf
542: Jünkerath Bf – Stadtkyll – Reuth – Schönfeld – Steffeln – Auel – Lissendorf – Birgel – Jünkerath Bf
543: Jünkerath Bf – Gönnersdorf – Lissendorf – Birgel (– Hillesheim)
544: Jünkerath Bf – Feusdorf – Esch (– Waldorf (NRW))
545: Hillesheim – Oberbettingen – Basberg – Auel – Steffeln – Duppach – Müllenborn – Oos – Büdesheim
546: Gerolstein Bf – Roth – Kalenborn-Scheuern – Oos – Müllenborn – Lissingen – Gerolstein Bf
549: Wiesbaum – Mirbach – Feusdorf – Jünkerath Bf
The sub-line bundle ensures the connection of the northwestern district area to the stations of the Eifel line in Jünkerath, Lissendorf, Oberbettingen-Hillesheim and Gerolstein. Furthermore, connections are established between the local communities and the assigned basic centres (Jünkerath/Stadtkyll or Hillesheim) In addition, the intersecting line 540 takes into account the historically grown traffic needs between the districts of Vulkaneifel and Bitburg-Prüm. Essential for the sub-line bundle is to ensure the accessibility of all school locations in the catchment area such as the secondary schools (including vocational schools) in Daun (with transfer connections), Gerolstein, Hillesheim and Jünkerath as well as primary schools in Gerolstein, Hillesheim, Jünkerath, Lissendorf and Stadtkyll. The day-care centres in Gerolstein, Hallschlag, Hillesheim, Jünkerath, Lissendorf and Stadtkyll will also be connected.
The services in bus transport can be provided according to schedule with 11 vehicles (2 solo buses Bn, 7 solo buses B, 1 minibus NBn, 1 minibus NB) and in an average calendar year with rounded 372,960 commercial car kilometers p.a. and rounded 10,431 timetable hours p.a. A total of 9 vehicles (of which min. 6 vans) are required for the services in on-call traffic. In the event that a subcontractor is commissioned, it must be ensured that a total of 9 vehicles can be used for call traffic. The estimated occupied kilometers (rounded) are 103,137 Bkm p.a.