The subject of the contract is the implementation of an exploration campaign with short drilling with a max. depth of 50m, which are to be carried out in various construction site areas of the Brenner base tunnel on the Italian side and partly expanded as groundwater measurement sites.
The subject of the contract is the implementation of an exploration campaign with short drilling with a max. depth of 50m, which are to be carried out in various construction site areas of the Brenner base tunnel on the Italian side and partly expanded as groundwater measurement sites.