Trockenbauarbeiten
General. Service: Sampling, static calculations
-Partition walls with and without fire protection, incl. connections, openings, etc. Single stud WD 112.5 -150mm : approx. 530 m², double stud WD 220mm : approx. 135m²
-Facing shell incl. connections, openings, etc. : approx. 175 m²
-Shaft wall with and without fire protection, incl. connections, openings, etc. approx. 145 m²
-Suspended ceiling plasterboard unperforated, incl. connections, openings, etc. approx. 248 m²
-Plasterboard perforated ceiling, incl. connections, openings, etc. approx. 1055 m²
-Suspended ceiling, ceiling panels, acoustic panels incl. connections, openings approx. 110 m²
-Manufacture, deliver, assemble interior doors SUz+HPL: approx. 20 pcs.
-Cavity floor, ramp and stairs, incl. connections etc. 29.8 m²
-Working platform incl. transfer of use