Basic repair of the carriageway and ancillary areas, modification of the cycling facility. The existing carriageway Wansbeker Allee including the ancillary areas will be renewed as part of a full extension. There is a four-lane roadway with a driving width of 3.00 m - 3.25 m provided. Retrofit of the carriageway and ancillary areas, modification of the cycling facility at the junctions (bicycling), asphalt milling, asphalt laying, road safety, marking, on-board and pavement work, concrete work (bus bay), renewal of hubs and trummen connection lines
Road surface asphalt base course 12 890 m
Road surface Making asphalt binder course 13 300 m
Road surface to produce asphalt base course 13 300 m
Road Surface Frost protection layer t produce 13 300 m
Walkway security strip, bike path 7 460 m
The measure will be produced in 3 phases of construction from 4.3.2019 to 2.11.2020.
The existing carriageway Wansbeker Allee including the ancillary areas will be renewed as part of a full extension. There is a four-lane roadway with a driving width of 3.00 m - 3.25 m provided. Retrofit of the carriageway and ancillary areas, modification of the cycling facility at the junctions (bicycling), asphalt milling, asphalt laying, road safety, marking, on-board and pavement work, concrete work (bus bay), renewal of hubs and trummen connection lines
Road surface asphalt base course 12 890 m
Road surface Making asphalt binder course 13 300 m
Road surface to produce asphalt base course 13 300 m
Road Surface Frost protection layer t produce 13 300 m
Walkway security strip, bike path 7 460 m