The total service advertised is awarded in 2 lots:
- Lot 1: takeover, transport and utilization of waste wood (AI - A III),
- Lot 2: takeover, transport and disposal of rubble.
Acquisition, transport and recycling of waste wood (AI - A III)- Provision of containers at recycling depots and recycling centers (approx. 34 open deposit containers with 10 m
- Expected amount: approx. 4,000 Mg / a - 5,000 Mg / a,
- Collection of containers on demand,
- Transport of the waste wood to the recycling plant, including implementation of all necessary logistics services (including processing, sorting, shredding, etc.),
- Material or thermal utilization of the waste wood.
Acquisition, transport and disposal of rubble- Provision of construction waste containers (6 flat roll-off containers (uncovered) with 12 m
- Provision of additional gypsum containers for the separate collection of building materials containing gypsum in the 3 recycling centers (a flat roll-off container with 12 m
- Collection of containers (exchange full for empty) and big bags on demand,
- If necessary, processing of the rubble / gypsum waste,
- Transport of building rubble and gypsum waste to the disposal / recycling plant,
- Disposal of building rubble (AVV 17 01 07) and gypsum waste (AVV 17 08 02),
- Disposal of contaminants (also over 5%).