Sanitary installations Period of execution 2.9.2019 - 28.8.2020.
Sanitary Installations Period of execution 2.9.2019 - 28.8.2020:
- approx. 450 m SW sewers (PP) with ground ventilation
- approx. 460 m SW underground pipes (KG),
- approx. 85 m SW underground pipes for greasy SW (PE),
- grease separator NS-4 (full equipment) with sampling well for underground installation,
- approx. 30 m underground drinking water pipe as PE80 AD 50 mm,
- approx. 1,590 m drinking water pipes made of stainless steel pipe with insulation,
- drinking water installation / equipment for:
- 29 toilet facilities,
- 32 WT systems,
- 16 stainless steel sinks,
- 1 shower facility,
- 11 sink basins,
- 5 Beh.-WC / WT- system consisting of toilet bowl, non-removable WT, support folding handles, back support, etc.,
- 3 workroom basins,
- Crystal mirror per WT system,
- Output kitchen consisting of CNS kitchen furniture with several base units, with drawers and wall cabinets. Combined CNS sink / hand basin, food delivery trolley, plate heat cabinet, utensil return trolley,
- 3 mini kitchens.