Delivery of 8 pcs. brand new electric low-floor city buses with delivery and installation of charging infrastructure equipment, including:
- 6 pcs. 12-meter electric buses – a detailed description of the subject of the contract in accordance with Annex 1 to the SWZ,
- 2 pcs. 18-meter electric buses - a detailed description of the subject of the contract in accordance with Annex 1 to the SWZ,
- charging infrastructure devices – a detailed description of the subject of the contract in accordance with Annex 2 to the SWZ and in accordance with the attached Functional and Utility Program (PFU).
Delivery of 8 pcs. brand new electric low-floor city buses with delivery and installation of charging infrastructure equipment, including:
- 6 pcs. 12-meter electric buses – a detailed description of the subject of the contract in accordance with Annex 1 to the SWZ,
- 2 pcs. 18-meter electric buses - a detailed description of the subject of the contract in accordance with Annex 1 to the SWZ,
- charging infrastructure devices – a detailed description of the subject of the contract in accordance with Annex 2 to the SWZ.
For the whole batch 8 pcs. of buses will be delivered and 4 two-station stationary charging stations for plug-in electric buses with a maximum output power of 120 kW with the possibility of working in a 2 x 60 kW system and 1 pantograph stationary charging station with a maximum output power of 300 kW, additionally equipped with a plug-in connector with an output power of 150 kW for emergency charging in case the pantograph cannot be used. Chargers must have certificates allowing them to be used in the European Union.
Delivery time: up to 300 days from the date of conclusion of the contract.