Creation of a building for the grouping of consultations of the Saint Camille Hospital with for the realization of this operation:
- The deconstruction of two small buildings, with asbestos removal operation for one of the two existing buildings.
- The preparation of the ground, the implementation of the foundations
- The construction of a new building with modular structure with the associated finishing works
LOT 1 - Asbestos removal and demolitionDemolition of 2 small buildings and asbestos removal of 1 of the 2 small buildings
LOT 2 - Structural Work and FoundationsPreparation of the site and implementation of the foundations for the new consultation building
LOT 3 - Construction and fitting out of the modular structure consultation buildingBuilding with modular structure including insulation and waterproofing, exterior carpentry and locksmithing, façade cladding, partitions, lining, false ceilings, interior carpentry, floor and wall coverings, painting and signage, CFO/CFA electricity, cvcd, plumbing and sanitary, medical fluids and elevators
LOT 4 - Roads Miscellaneous networksVRD and green space development