The new building, which is to be founded on piles, consists of 1 basement level, the concrete “platform” with public use areas and classrooms, and 2 “point houses” in timber element construction (lightweight metal façade) standing on the platform, which house general classrooms. The roof area of the platform will become part of the schoolyard by applying a landscaped roof.
105 sqm composite floor waterproofing, 105 sqm floor tiles 30/30, 1,120 sqm floor tiles in the railway system, 365 sqm wall tiles, 40 sqm of clean running