The contract includes optional instalments defined in the specifications. Each lot will be allocated separately. The services are paid for by fixed prices.- Construction of a boarding school in traditional wooden frame with straw infill (Sdo built: 1047 m2 - surface area of the complexes (walls, floors and roofs) in straw: 1,800 m2).- Rehabilitation of the day school by renovation of the covered enclosure of buildings a, b,c, d,e,f and G, accessibility of the entire J.Cocteau high school in Miramas (13). This consultation concerns the revival of lots 3 "Metal structure, metalwork, locksmithing" and 4 "Exterior joinery, wood, aluminium, blackouts". It is part of an operation comprising 9 lots. The remaining lots were the subject of a previous consultation and have been allocated
Lot No. 3: Metal Structure, Metalwork, Locksmithingconstruction of fully glazed walkways to replace the demolished bastions (3 Sdp footbridges: 74 square metres), installation of a covered gallery in the courtyard (linear gallery built: 66 ml), construction of locksmith work: fixed vertical and horizontal sunshades, fencing with specific Jean Cocteau motifs
Lot 4: Wood-aluminium exterior joinery, shadingreplacement of all the building's joinery and installation of blackout systems (Bso / blinds). Number of joinery removed/replaced / 650 u). Construction of the boarding school: implementation of wood/aluminium joinery and blackout systems (Bso/Blinds). Number of joinery installed: 210 u