This works contract relates mainly but not exhaustively to:
- the measures necessary for the organization of traffic during the works;
- the necessary topographical work as well as the preparation of detailed plans of the works to be carried out;
- the establishment of the inventory of all the riparian properties, and this for all the built parts, in plan, in elevation and in basements, of which the cadastral plot is located less than 12 m from the edge of the excavations to be carried out for the work described below.
(See p. 3-4 of CSC).
See CSC P. 3-4.