Bremer Bäder GmbH intends to build a replacement building for the indoor swimming pool on the grounds of the Westbad in Bremen Walle at Waller Heerstraße 293 A in 28219 Bremen. For this purpose, the old indoor pool will be demolished, the existing outdoor pool will remain unaffected by the measure, but must be taken out of operation for the duration of the construction work. The directly adjacent Paradice ice rink will remain in operation.
The indoor pool has a total dimension of 51 * 63 m, building height 5.0 to 9.10 m, gross volume 31,000 m3.
The indoor pool will be equipped with the following pools:
-Combi pool with diving system and lifting floor, 15.0 * 25.0 m, water depth 3.5 - 0.0 m,
-Teaching pool, 12.5 * 8.0 m, water depth 1.35 - 0.8 m,
-Course pool 1 without lifting floor, 7.0 * 8.6 m, water depth 1.35 m,
-Course pool 2 with lifting floor, 11.6 * 8.60 m, water depth 1.8 - 0.0 m,
-Toddler pool, 7.0 * 5.2 m, water depth 0.4 to 0.2 m, 40 m² WF
3,700 m2 construction road, RC ballast mixture 0/32, d= 50cm
2.600 m2 Schotterschicht, RC-Schottergemisch 0/32, d= 20cm
7.400 m3 Baugrubenaushub
6,300 t of soil removal / disposal
100 m2 girder wall with 11 steel girders HEB 340-400, l= 10.5m