Outside doors and windows shall be replaced in all facades as well as 2 roof windows.
The external covering shall be replaced.
Bargeboards and weather boards with fittings shall be replaced as well as rain gutters on the staircase superstructure. Individual roof tiles/crest tiles shall be fixed.
Railings/banisters shall be delivered and assembled in the stairway.
The main staircase in concrete shall be demolished and a new staircase shall be constructed including wheelchair access.
The whole building shall be painted.
The work consists of all related and necessary works.