Overall renovation of the Collège de la Barre in Lausanne
CFC 273 Interior Joinery
Lot 1 of the interior carpentry work includes:
- preparatory work and protection
- supply and installation of fire doors for corridors
Lot 2 of the interior carpentry work includes:
- preparatory work and protection
- supply and installation of door with glazed transom
- supply and installation of simple door
- supply and installation of single door EI 30
- supply and installation of door and toilet wall
- supply and installation of a glass wall in the infirmary
- restoration of a glass wall in the concierge room
- supply and installation of a wall in the multipurpose room
- supply and installation of furniture
- restoration of panelling and built-in cabinets
Fire Doors
Interior carpentry: doors with glazed transom, single doors, single doors EI 30, doors and walls WC