The subject of the contract is the preparation of project documentation for medium pressure gas pipelines, Sejny-Krasnopol and Sejny-Giby, province Podlasie, divided into the following two tasks (parts).
Task 1 (part 1) - Construction design, detailed design and supervision of the DN225 medium pressure gas pipeline of length. about 8 925 m, DN125 about 740 m long, DN90 about 3 187 m long, DN63 about 2 854 m long and DN40 about 508 m long at Sejny (Konarskiego Street) - Radziuszki Pawłówka - Krasnopol (Wojska Street) Polski) and in the city of Krasnopol, ul. Mickiewicz, Polish Army, Sienkiewicz, Polna, May 1, Lipowa and July 27. Shut-off fittings should be designed on the gas pipeline.
The deadline for completing the order for task 1 (lot 1) - 12 months after signing the contract.
A detailed description of the subject of the contract is specified in the Terms of Reference with attachments available at: https://zamowienia.psgaz.pl
Task 2 (part 2) - execution of the construction design, detailed design and supervision of the author's DN125 medium pressure gas pipeline with a length of about 6 800 m from the city of Sejny, ul. 1st May, plot 984/1 to Giby town plot 637/2. Shut-off fittings should be designed on the gas pipeline.
The deadline for completing the order for task 2 (lot 2) - 12 months after signing the contract.
A detailed description of the order is set out in the Terms of Reference with attachments available at: https://zamowienia.psgaz.pl