Allow the use of irrigation water from the Adige river through the LEB channel, which will replace the derivations of the Fratta river, along the same river starting from Cologna Veneta up to Merlara.
The project involves the construction of a new pipeline to be laid alongside the Fratta river route with North-South development that will result from a intake at the LEB channel calculated for 2 025 l / s and will extend for about 19 000 meters, in GRP pipes with a variable diameter from 1 800 mm up to 1 000 mm.
The design solution includes a length of 1 800 mm pipe with a length of 5 265 m, a 1 600 mm section laid for approximately 6 407 m, a 1 400 mm section for a total of 5 190 m, and finally a section of 1 000 mm for a development of 1 906 m.
The following artifacts are also provided:
- intake of the LEB channel,
- n. 6 artifacts derived from the project pipeline,
- n. 5 crossings with microtunneling.
- OG6 - Aqueducts, gas pipelines, oil pipelines, irrigation and evacuation works - EUR 20 415 438.23 - SOA = VIII,
- OG4 - Works of art in the subsoil - EUR 5 108 762.27 - SOA = V,
- OG3 - Roads, highways, bridges, viaducts, railways, tramways, subways, funiculars, airport runways, and related complementary works - EUR 563 216.01 - SOA = II,
- OG11 - Technological plants - EUR 540 531.12 - SOA = II.