For the waste management and city cleaning company Hamm (client), the city of Hamm offers the supply and installation of two side-loader bodies for waste collection vehicles on MAN chassis and a rotary drum body on a Mercedes Benz “Econic” chassis in an open process throughout Europe.
Sideloader structure according to DIN EN 1501-2Delivery and installation of two side-loader bodies for waste collection vehicles on MAN chassis
The chassis for the side loader bodies (MAN) are expected to be delivered in calendar week 46/2022 and provided by the client for the body.
The two sideloader bodies must be mounted on MAN chassis, model TGS 26.360 6x2-4BL.
The detailed specifications of the chassis to be set up can be found in the systems:
- Fahrgestellbeschreibung_Daimler_ECONIC_Drehtrommelaufbau.pdf
Rotating drum construction including filling for waste collection vehicle (rear loader) according to DIN EN 1501-2Delivery and assembly of a rotary drum body on a Mercedes Benz “Econic” chassis.
The chassis for rotating drum construction including filling for waste collection vehicle (rear loader) in accordance with DIN EN 1501-2 is expected to be completed in June 2022 and then provided by the client for assembly.
The revolving drum body must be mounted on a Mercedes chassis, type “Econic”.
The detailed specifications of the chassis to be set up can be found in the systems:
- Fahrgestellbeschreibung_MAN_Seitenladeraufbau.pdf