The overall project linked to this contract is the installation of turbine on the reserved flow of the Rabodanges hydroelectric development (61);
This contract notice concerns lot IEG CC HTA. The Civil Engineering and Group lots are the subject of separate contract notices;
The purpose of the contract will be the dimensioning, supply and installation of electrical and control equipment associated with the installation of a reserved flow turbine unit.
The service corresponds to the design, supply, installation and commissioning of:
• Automation necessary for the management and safety of the new group
• Auxiliaries needed for the new group
• Auxiliaries needed for the new building
And the following modifications of the existing:
• Adaptation des protections HTA
• Addition CPI and isolation transformer on the auxiliaries of the current plant
The main objectives and constraints of the Market are as follows:
The implementation of all the electrical equipment necessary for the production and optimal exploitation of the reserved flow,
The operation is planned between June 2024 and December 2024;
The generator will be supplied by the "mechanical" market.
The expected type of generator is asynchronous, 400V three-phase, about 200kVA - 160 kW.
This list is not exhaustive. The full scope will be described in a set of specifications that will be attached to the consultation file, sent only to the companies that have been preselected at the end of this call for applications.