The Michaelschule on Dierkower Damm is an inclusive all-day school. In 2015, the entire building shell of the 5-storey prefabricated building was renovated. Two connectors with staircase and elevator systems as well as BA II transoms were added.
The tendered service includes in BA 3 the installation of the impact wall in the sports hall.
Lot 3.09.1 point elastic impact wall,
About 200 m