1x Unterverteilung
2x inverter
113 kWp photovoltaic generators with supporting structure
1500m Solarkabel
Installation of a PV system with approx. 110kWp with installation of the sub-distribution. The installation of the measuring system and the low-voltage cabling is carried out on site. The complex is divided into 3 buildings.
Scaffolding is required for two of the buildings.
1x Unterverteilung
2x inverter
113 kWp photovoltaic generators with supporting structure
1500m Solarkabel