Traffic data acquisition AK Du-Süd A59-A524
The tendered services include the work on the construction of traffic data acquisition in the area of the Duisburg-Süd working group (BAB A59/A524/B8n/B288) including AS Huckingen and on the A524 between AS Du-Rahm and AD Breitscheid.
Type and scope of the service
- execution planning
- The necessary traffic safety according to RSA 95 and ZTV-SA97 to carry out the work
- taking into account the specifics of the above-mentioned BAB.
- Supply and install approx. 2700 m of fiber optic cable, acceptance measurement.
- supply and install approx. 3700 m of SFK
- approx. 2510 m power cable various Deliver and install sizes, acceptance measurement.
- Approx. 1400 m FM cable 10 or 20 DA (local bus connection for inductive loops).
- Approx. 770 m cable protection pipe route with multiple runs in open design.
- Supply and install approx. 3200 m of multiple pipe 3x32x2.0 in most existing KSR 110 DA
- approx. 13 cable ducts, various Deliver and install sizes.
- Deliver 1 cable duct through and replace it with an existing one (too small)
- Create approx. 100 m³ excavation pit for shafts
- Construct 1 concrete cable house in monolithic construction (completely furnished)
- approx. 35 m² production of paved maintenance areas at the SSt sites
- approx. 100 m² of paving work around existing and new cable ducts
- Supply and install 7 switchgear and control cabinets (SSt) with equipment
- Supply and install 5 control module units and due technology.
- 7 sites with traffic detection units DEG for SSt and DZ
from 1 to 4 lanes including parallel lanes (both FR)
- 47 double loop panels for traffic detection stations (SSt) in 2 to 3-strip
Directional lanes on the motorway, as well as on ramps and parallel lanes. With the
required cutting and potting work, including production of
Make transitions between the loop panel and the transfer terminal box/sockets/ST, including excavation and drilling work.
- Set up and connect 2 pieces of ZAS (available as replacement) with equipment
- Set up and connect 2 pieces of S-KVS with equipment
- 2 pieces disassembly of existing ZAS
- 2 pieces disassembly of existing parts
- 1 piece disassembly of unneeded electrical parts in the pre. concrete shelter (BSH)
- Perform ready-to-use electrical installation properly and professionally.
- Manufacture of the required earthing systems with appropriate connections.
- Introduce the WG to the maintenance concerns of the plant.
- Inventory measurement, inventory planning.
- produce documentation