New construction of a four-lane integrated comprehensive school - facing brickwork.
Execution of the facing wall works for the new construction of a four-level integrated comprehensive school with auditorium and 2-field sports hall as well as official residence.
- BGF approx. 14 500 m²,
- BRI approx. 62 450 m³.
The works essentially include:
- approx. 120 m² barrier layer> 50 cm,
- approx. 2 760 m² MW insulating material 300 mm, WLG 032, facing brickwork,
- approx. 180 m² insulation base perimeter XPS, WLG 037, 300 mm,
- approx. 2 350 m² clinker brickwork: smooth wild bandage,
- approx. 500 m² clinker brickwork: profiled Wilder dressing,
- approx. 350 m² clinker brickwork: profiled hole dressing,
- approx. 2 850 m² masonry anchor, shell distance 340 mm,
- approx. 350 m creating soffits,
- meandering approx. 275 m movement joint in the facing masonry,
- approx. 530 m expansion joint round cord + PU-sealant vertical,
- approx. 340 m console anchor, interception linear,
- approx. 760 m of prefabricated lintel / façade interception,
- approx. 15 m precast concrete elements supported,
- approx. 175 m prefabricated façade interception,
- approx. 340 St. permanent scaffold anchors,
- about 185 St. windpost anchors, div. Altitudes,
- approx. 135 m drainage channels stainless steel,
- about 700 m covering attic crowns during construction,
- approx. 2 560 m² masking and covering of adjacent components,
- approx. 3 290 m² cleaning facing masonry clinker,
- approx. 40 m² veneer starboard support wall with clinker straps,
- approx. 1 piece veneer door with clinker straps,
- approx. 1 St. parapet prefabricated loggia, covered with clinker straps.